What procedures do you need to apply for charging pile installation

2020-06-01
What procedures do I need to apply for charging pile installation? To apply for the installation of charging piles, you must submit an application for electricity use to the electric power department, and provide ID cards and proof of property rights for fixed parking spaces, or permission certificates for parking space property units and certificates issued by the property company for consent to use charging and replacement facilities. In addition, it is necessary to sign the "Electricity Agreement for the Use of Electric Vehicle Charging Piles" with the power supply company. After the application is accepted, the power supply company will go to the site to check the power supply conditions, and then install the meter and connect the power.
4
Individuals applying for the installation of charging piles need to bring their personal ID cards, and propose installation intention to the nearest business hall. At the same time, the applicant submits a power application to the power company in the area with the car purchase intention agreement, parking space plan or on-site environment photo, community parking space property rights or long-term use right certificate for more than one year, and charging pile installation level certification document.

If you have to apply for electricity to a charging pile that has been built, it is recommended to prepare the following information:
1. Identification documents.
2. The identity certificate and authorization letter of the manager. (The client does not need this one hundred)
3. Proof of ownership of the property at the electricity address.
4. For projects occupying the public places of the community, such as the parking lot of the community, the consent of the owners' committee or the charging infrastructure construction issued by the property shall also be provided.
5. If the customer only rents a car, at the same time, the consent materials of the car owner must be provided.
6. If you are in a social public place, such as a roadside, you need to obtain the certification and permit materials such as the planning and construction of the relevant government departments.

Shenzhen Hongjiali New Energy Co., Ltd.
Business Type:Manufacturer , Service
Product Range:Battery Charger , Battery Charger
Products/Service:ev charger , dc ev charger , car charger , evse charger , charging pile , Charger cabinet
Certificate:ISO10012 , ISO14001 , ISO9001 , GB , CCC , CE , EMC , RoHS , TUV , UL , OHSAS18001
Company Address:West 2nd Floor, Building 68, Changxing Science and Technology Industrial Park, Changzhen Community, Yutang Street, Guangming New District, Shenzhen, Guangdong, China

Previous: Electric motorcycle charging pile brand

Next: Ranking of professional charging pile manufacturers

Related Products List

Home

Phone

Skype

Inquiry