Self-use charging pile installation process Take Shenzhen Hongjiali New Energy Co., Ltd. 7kw self-use charging pile as an example, the installation process is as follows:

1. Before installation, please check whether the packing box contains the following items:
1. 1 wall-mounted AC Charging Pile / 1 vertical AC charging pile
2. 2 test cards (with or without card reader)
3. Installation manual 1
4. 1 certificate
5. Install 4 expansion screws
6. Install a wall shelf (wall-mounted) / column (post-style) / vertical without wall-mounted bracket
Hongjiali
2. Installation environment requirements
1. This series of AC charging piles are outdoor charging piles, meeting IP54 protection level
2. Please ensure the ambient temperature is between -25℃ and +50℃

Three, installation method
This series of AC charging piles can be wall-mounted, column-mounted or vertical-mounted according to requirements. You can choose the bracket produced by our company and install it according to the following steps:
1. Make a cement base, pre-install 4 bolts on the cement bottom, and pre-install a charging pile at the center of the base
2. After the cement base is finished, insert the embedded charging pile into the support base, tighten the screws of the support base, and fix the support base on the cement base
3. Pass the charging pile inlet through the power outlet hole of the bracket and fix it on the bracket, tighten the screws in the middle of the bracket, and fix the upper and lower parts of the bracket.

Four, installation instructions
1. It is recommended that the design height of the building foundation is ≥1200mm
2. It is recommended to design the specifications of the anchor bolts as M6×40 or M6×60
3. It is recommended that the design cross-sectional area of the external multi-strand copper core cable is ≥2X6mm2

If you want to learn more about the "installation process of self-use charging piles", you can directly call Shenzhen Hongjiali New Energy Co., Ltd. by calling 15919974865!

Shenzhen Hongjiali New Energy Co., Ltd.
Business Type:Manufacturer , Service
Product Range:Battery Charger , Battery Charger
Products/Service:ev charger , dc ev charger , car charger , evse charger , charging pile , Charger cabinet
Certificate:ISO10012 , ISO14001 , ISO9001 , GB , CCC , CE , EMC , RoHS , TUV , UL , OHSAS18001
Company Address:West 2nd Floor, Building 68, Changxing Science and Technology Industrial Park, Changzhen Community, Yutang Street, Guangming New District, Shenzhen, Guangdong, China

Previous: Sources of profit for charging pile projects

Next: AC charging pile integrated floor type double gun 7KW

Related Products List

Home

Phone

Skype

Inquiry